Kanga Digger – Trenching and Civil Works
AMG Electrical Solutions has added a Kanga Digger to our list of equipment! Trenching and civil works can all now be carried out in house by our experienced team on…
AMG Electrical Solutions has added a Kanga Digger to our list of equipment! Trenching and civil works can all now be carried out in house by our experienced team on…
Stand alone solar powered system we designed, fabricated installed and commissioned for the remote monitoring of plant outflows. AMG Electrical Solutions are the "go to" contractors in the South Burnett…
Recent Air Conditioner installations by the team at AMG Electrical Solutions. Please contact us on 0422885905 if you are after a price on the installation of a system!
Outlets and load center installed on a generator for a local business.
Stainless Steel Telemetry cabinet we installed at the end of 2016
Commissioning an ultrasonic level transmitter to control a dosing system based off flow through a V-Notch drain.
Custom stainless steel bracket we fabricated to hold a level sensor for a local plant. Sensor and bracket installed with sensor feedback installed into our customers SCADA system for remote…
Before and after photos of old mains connection box and consumer mains which AMG Electrical Solutions upgraded for a 14 unit complex.
22kW Danfos Aquadrive installation we carried out recently. AMG Electrical Solutions supplied and installed a suitably sized cabinet to allow for a second drive to be installed in the future…
Center pivot electrical installation we completed recently. Installed and commissioned second hand control cabinet and hydraulic pack supplied by our customer.