AMG supplied and installed a new main switchboard and integrated it with a Grundfos Skid Set, metering, and control systems. The setup included:
- Flow meter
- Analyzers
- Dosing pump
Supply interruption was limited to an 8-hour cutover period, coordinated with SBRC personnel, Ergon Energy, and third-party contractors.
