PCA – Blanching Plant Transformer Upgrade
AMG carried out electrical and civil work for the installation of a 1500kVA pad-mounted transformer. The scope included: The project […]
AMG carried out electrical and civil work for the installation of a 1500kVA pad-mounted transformer. The scope included: The project […]
AMG was responsible for the electrical and control system design and installation to support: The project included over 4,000m of
AMG supplied and installed a new switchboard, control system, and cabling to facilitate 2 × 7.5kW pumps for non-potable water
AMG installed a new switchboard, control systems, and cabling to operate 2 × 75kW pumps to service non-potable water requirements.
AMG supplied and installed a new main switchboard and integrated it with a Grundfos Skid Set, metering, and control systems.
AMG was responsible for supplying and installing a new main switchboard, manufacturing PLC and MCC cabinets, and developing a functional
AMG was responsible for the complete electrical, controls, and SCADA upgrade of sewer pump stations at: Work included supplying and
AMG carried out thermal imaging at a local site to identify potential faults and rectify them before they caused significant